Client: SK Engineering and Construction.
Execution Date: February 2022 – effective.
Execution period: In effect.

Description of work:

  • Nitrox diving.
  • Connection of flexible and rigid pipes.
  • Drilling with pneumatic and hydraulic machines.
  • Breaks and rock removal.
  • Hypochlorite line connections.
  • Inspections with robotic unit.
  • Dredged.

Client: Geovenor Explora SpA.
Execution Date: February 2022 – July 2022.
Execution period: 6 months.

Description of work:

  • Soundhole B1, collection tower
  • Soundhole B5, extreme outfall zone.
  • Soundhole B6, intermediate outfall zone.
  • Borehole B4, intake excavation zone.
  • Soundhole B2, intermediate intake zone.
  • Soundhole B7, outfall excavation area.

Client: Arrigoni Engineering and Construction S.A.
Execution Date: January 2021 – December 2021.
Execution period: 1 year.

Description of work:

  • Floor leveling around the Dolphin
  • Concrete wall surface cleaning
  • Repair nests and cracks with Hilti product
  • Dowel installation, drilling and anchoring
  • Installation of formwork, reinforcement, concreting
  • Removal of moldings
  • Demolition of foundation around piles.
  • Installation of containers on piles to rebuild foundation
  • Container concrete
  • Final cleaning, demolition material removal and video
  • Underwater rockcasting 50m.
  • Underwater inspections with divers and robotic unit.
  • Foundation cleansing
  • Firehole
  • Moulding
  • Concrete
  • Filling
  • Background cleaning

Client: Belfi S.A.
Execution Date: September 2021.
Execution period: 1 month.

Description of work:

  • Installation of studs in dead ends for adduction pipe.

Client: Belfi S.A
Execution Date: December 2020 – March 2021.
Execution period: 4 months.

Description of work:

  • Belfi 2 platform assembly.
  • Maritime transport of personnel.
  • Underwater inspections with diver and robotic unit.
  • Anchoring Movements.
  • Installation of footings.

Client: SK Engineering and Construction.
Execution Date: January 2020 – December 2020.
Execution period: 1 year.

Description of work:

  • Support for topographical tasks.
  • Installation, repositioning and removal of anchoring systems (anchor, chains, cables and buoys) of the construction vessels with the help of balloons lift up.
  • Underwater inspections and filming.
  • Drilling, cutting and/or rock cutting.
  • Support task for Jack Up Location.
  • Support for the manipulation and installation of spies, cables and/or chains for the temporary positioning of naval artifacts.
  • Underwater inspections with DGT3 Deep Trekker robotic unit.
  • Cuts with thermal lance.
  • Jack Up positioning.
  • Diving with Nitrox gas mixture.

Client: Orizon S.A
Execution Date: August 2020 – December 2020.
Execution period: 5 months.

Description of work:

  • Construction, launch and removal of water and oil lines (220 meters).
  • Land welding of water and oil lines.
  • CLIN support.
  • Launch of water and oil lines.
  • Positioning of lines on the seabed.
  • Connection of lines on pontoon and manifold on land.

Client: Orizon S.A
Execution Date: December 2019 – July 2020.
Execution period: 8 months.

Description of work:

  • Underwater inspection of the fleet.
  • Underwater instrument cleaning.
  • Underwater Technical Inspection service dock.
  • Repair of piles and structure of the service dock.
  • Construction and installation of 21 service dock braces.
  • Flexible connection.
  • Repair of service dock piles.
  • Manufacturing and launching of new underwater pipelines.
  • Background cleaning.

Client: SK Engineering and Construction.
Execution Date: August 2018 – August 2019.
Execution period: 1 year.

Description of work:

  • Removal of 18” hydrocarbon pipeline, 420 meters long.
  • Removal of 18” phenol pipe, 420 meters long.
  • Removal of 6” 420 meter long oil pipeline.
  • Removal of 3” water pipe and 420 meters in length.
  • Disconnection of PLEM anchor with mechanical and underwater cutting tools (thermal lance and torch).
  • PLEM extraction (4 tons).
  • Sink of the new pipe, considering the position required by SKCOMSA.
  • Installation of 4 slabs of 22 tons each, with the support of lifting balloons and boat.
  • Installation of brake away valves.
  • Flexible connection.
  • Cathodic protection with HDPE blankets.
  • Dredged.
  • LAUNCH OF NEW OXIQUIM TERMINAL SUBMARINE LINES:
  • Submarine and maritime support in the launch of all new submarine lines.
  • Removal of flotation structure and auxiliary structure.
  • Execution of inspection records of the state in which the lines were later upon launch.
  • Delivery of audio-visual recording and reports of executed activities.
  • Arm

Client: Corporal Froward.
Execution Date: July 2019.
Execution period: 1 month.

Description of work:

  • Technical inspections of grating buoys and set of chains.
  • Recovery and connection of grating buoy chain.

Client: Petrohué Investments.
Execution Date: November 2019 – December 2019.
Execution period: 2 months.

Description of work:

  • Installation and removal of 22 struts at the TubĂşl cove dock (Arauco).
  • Installation of underwater epoxy putty.
  • Cut with Torch.

Client: Onix Limitada.
Execution Date: June 2018 – July 2018.
Execution period: 2 months.

Description of work:

  • Welding of 363 anodes weighing 220 kilos on piles and sheet piles of the pier Angamos, port Angamos de Mejillones.
DO YOU NEED HELP?

Fill the following form and we will contact you at the shortest possible time
OUR
PROJECTS

Client: SK Engineering and Construction.
Execution Date: February 2022 – effective.
Execution period: In effect.

Description of work:

  • Nitrox diving.
  • Connection of flexible and rigid pipes.
  • Drilling with pneumatic and hydraulic machines.
  • Breaks and rock removal.
  • Hypochlorite line connections.
  • Inspections with robotic unit.
  • Dredged.

Client: Geovenor Explora SpA.
Execution Date: February 2022 – July 2022.
Execution period: 6 months.

Description of work:

  • Soundhole B1, collection tower
  • Soundhole B5, extreme outfall zone.
  • Soundhole B6, intermediate outfall zone.
  • Borehole B4, intake excavation zone.
  • Soundhole B2, intermediate intake zone.
  • Soundhole B7, outfall excavation area.

Client: Arrigoni Engineering and Construction S.A.
Execution Date: January 2021 – December 2021.
Execution period: 1 year.

Description of work:

  • Floor leveling around the Dolphin
  • Concrete wall surface cleaning
  • Repair nests and cracks with Hilti product
  • Dowel installation, drilling and anchoring
  • Installation of formwork, reinforcement, concreting
  • Removal of moldings
  • Demolition of foundation around piles.
  • Installation of containers on piles to rebuild foundation
  • Container concrete
  • Final cleaning, demolition material removal and video
  • Underwater rockcasting 50m.
  • Underwater inspections with divers and robotic unit.
  • Foundation cleansing
  • Firehole
  • Moulding
  • Concrete
  • Filling
  • Background cleaning

Client: Belfi S.A.
Execution Date: September 2021.
Execution period: 1 month.

Description of work:

  • Installation of studs in dead ends for adduction pipe.

Client: Belfi S.A
Execution Date: December 2020 – March 2021.
Execution period: 4 months.

Description of work:

  • Belfi 2 platform assembly.
  • Maritime transport of personnel.
  • Underwater inspections with diver and robotic unit.
  • Anchoring Movements.
  • Installation of footings.

Client: SK Engineering and Construction.
Execution Date: January 2020 – December 2020.
Execution period: 1 year.

Description of work:

  • Support for topographical tasks.
  • Installation, repositioning and removal of anchoring systems (anchor, chains, cables and buoys) of the construction vessels with the help of balloons lift up.
  • Underwater inspections and filming.
  • Drilling, cutting and/or rock cutting.
  • Support task for Jack Up Location.
  • Support for the manipulation and installation of spies, cables and/or chains for the temporary positioning of naval artifacts.
  • Underwater inspections with DGT3 Deep Trekker robotic unit.
  • Cuts with thermal lance.
  • Jack Up positioning.
  • Diving with Nitrox gas mixture.

Client: Orizon S.A
Execution Date: August 2020 – December 2020.
Execution period: 5 months.

Description of work:

  • Construction, launch and removal of water and oil lines (220 meters).
  • Land welding of water and oil lines.
  • CLIN support.
  • Launch of water and oil lines.
  • Positioning of lines on the seabed.
  • Connection of lines on pontoon and manifold on land.

Client: Orizon S.A
Execution Date: December 2019 – July 2020.
Execution period: 8 months.

Description of work:

  • Underwater inspection of the fleet.
  • Underwater instrument cleaning.
  • Underwater Technical Inspection service dock.
  • Repair of piles and structure of the service dock.
  • Construction and installation of 21 service dock braces.
  • Flexible connection.
  • Repair of service dock piles.
  • Manufacturing and launching of new underwater pipelines.
  • Background cleaning.

Client: SK Engineering and Construction.
Execution Date: August 2018 – August 2019.
Execution period: 1 year.

Description of work:

  • Removal of 18” hydrocarbon pipeline, 420 meters long.
  • Removal of 18” phenol pipe, 420 meters long.
  • Removal of 6” 420 meter long oil pipeline.
  • Removal of 3” water pipe and 420 meters in length.
  • Disconnection of PLEM anchor with mechanical and underwater cutting tools (thermal lance and torch).
  • PLEM extraction (4 tons).
  • Sink of the new pipe, considering the position required by SKCOMSA.
  • Installation of 4 slabs of 22 tons each, with the support of lifting balloons and boat.
  • Installation of brake away valves.
  • Flexible connection.
  • Cathodic protection with HDPE blankets.
  • Dredged.
  • LAUNCH OF NEW OXIQUIM TERMINAL SUBMARINE LINES:
  • Submarine and maritime support in the launch of all new submarine lines.
  • Removal of flotation structure and auxiliary structure.
  • Execution of inspection records of the state in which the lines were later upon launch.
  • Delivery of audio-visual recording and reports of executed activities.
  • Assembly and assembly of new PLEM.
  • Removal of protections, transfer of tiles to the indicated place with safety equipment lifting and lifting maneuvers.

Client: Leco Engineering.
Execution Date: October 2018 – December 2018.
Execution period: 3 months.

Description of work:

  • Inspection and technical evaluation of emissaries of the Essbio company: TomĂ©, Penco, Talcahuano - San Vicente, San Pedro, Coronel Norte, Coronel Sur, Lebu, and Lota.
  • Inspection and technical evaluation of the Essval company outfall: Outfall Higuerillas submarine. (concĂłn).
  • Taking water samples in the Essbio burbot outfall sector.
  • Repair Coronel Sur outfall section with stainless steel liners and removal of blind covers.
  • Dredged.

Client: Corporal Froward.
Execution Date: July 2019.
Execution period: 1 month.

Description of work:

  • Technical inspections of grating buoys and set of chains.
  • Recovery and connection of grating buoy chain.

Client: Petrohué Investments.
Execution Date: November 2019 – December 2019.
Execution period: 2 months.

Description of work:

  • Installation and removal of 22 struts at the TubĂşl cove dock (Arauco).
  • Installation of underwater epoxy putty.
  • Cut with Torch.

Client: Onix Limitada.
Execution Date: June 2018 – July 2018.
Execution period: 2 months.

Description of work:

  • Welding of 363 anodes weighing 220 kilos on piles and sheet piles of the pier Angamos, port Angamos de Mejillones.